Welcome Guest Search | Active Topics | Log In | Register

Toyota Supra F+F Issues 21 - 26 Options
roymattblack
#1 Posted : 14 December 2025 12:44:00

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,183
Points: 15,698
Location: ipswich
STAGE 21:

Front cross member.

Pic 1: Retrieve the front chassis assembly and locate the stabilizer bar 21D.
Fit it in place as shown and fix each end to the drop links 15F and 17F using 1 x AM screw in each end.

Pic 2: Detail of the left side.

Pic 3: Detail of the right side.

Pic 4: Fit the 2 x securing brackets 21C and fix with 2 x AM screws in each.

Pic 5: Fit the front cross member 21A as shown and fix using 2 x BM screws.

Pic 6: Fit the front panel 21B and fix with 3 x IM screws.

Pic 7: Store the assemble safely.
roymattblack attached the following image(s):
PARTS 21.JPG
21 (1).JPG
21 (2).JPG
21 (3).jpg
21 (4).JPG
21 (5).JPG
21 (6).JPG
21 (7).JPG
roymattblack
#2 Posted : 15 December 2025 10:28:35

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,183
Points: 15,698
Location: ipswich
STAGE 22:

Chassis centre.

Pic 1: Fit the fuel line 22C to the filter 22B.

Pic 2: Fit the filter to the front of the main chassis 22A as shown and fix with 1 x IM screw.

Pic 3: Fit the front chassis assembly to the main chassis 22A as shown and fix with 2 x BM screws on each side.

Pic 4: Close up of the left side fixings.

Pic 5: Close up of the right side fixings.

Pic 6: Run the two brake lines 20E and 20F along the transmission tunnel as shown.

Pic 7: Fix the lines in place with pieces of tape 22D.

Store the assembly safely for now.

roymattblack attached the following image(s):
PARTS 22.JPG
22 (1).JPG
22 (2).JPG
22 (3).JPG
22 (4).JPG
22 (5).JPG
22 (6).JPG
22 (7).JPG
roymattblack
#3 Posted : 16 December 2025 10:15:52

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,183
Points: 15,698
Location: ipswich
STAGE 23:

Chassis reinforcement.

Pic 1: Fit the chassis reinforcing rails 23A and 23B as shown.
They will only fit one way.

Pic 2: From the other side, fix with 3 x AP screws in each.

Pic 3: Fit the battery wire 23D to the pin underneath the starter motor 7G.

Pic 4: Retrieve the chassis assembly and fit the engine in place between the front side frames as shown.

Pic 5: From underneath, fix the right side of the engine to the chassis with 1 x BM screw.

Pic 6: From underneath, fix the left side of the engine to the chassis with 1 x BM screw.

Pic 7: Fit the transmission support 23C in place and fix with 4 x AM screws.

Pic 8: Secure the gearbox casing using 2 x BM screws.

Pic 9: Connect the end of the fuel line 22C (highlighted in white for clarity) to the pin on the end of the injector rail.

Pic 10: Connect the end of the duct 9O (highlighted in white for clarity) to the pin on the side of the steering pump 14P.

Store the model safely.

roymattblack attached the following image(s):
PARTS 23.JPG
23 (1).JPG
23 (2).JPG
23 (3).JPG
23 (4).JPG
23 (5).JPG
23 (6).JPG
23 (7).JPG
23 (8).JPG
23 (9).JPG
23 (10).JPG
roymattblack
#4 Posted : 16 December 2025 11:56:57

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Official Builds, Administrators, Moderator, Global Forum Support, Registered

Joined: 04/06/2011
Posts: 5,183
Points: 15,698
Location: ipswich
STAGE 24:

Chassis rear reinforcement.

Pic 1: Fit the rear chassis panel 24A to the main chassis 22A as shown.
The part needs to be fitted from underneath.

Pic 2: From above, fix with 4 x IP screws.

Store the model safely.
roymattblack attached the following image(s):
PARTS 24.JPG
24 (1).JPG
24 (2).JPG
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.166 seconds.